NAMALAB SA actively participates in small and large infrastructure projects in Greece and abroad, contributing to the design, study and quality control of the construction. It also cooperates with producers of construction materials in the field of laboratory control of raw materials and the final manufactured product (aggregate materials, concrete, mortars, bitumen, etc.)

Experience over many years of the staff, as well as the more than 500 completed projects in the short time the company has been active, prove the ability and efficiency of the company, some of which are:

  • Stavros Niarchos Foundation Cultural Center Hydrodrilling
  • TAP Compression Station
  • GCS00 Evros Gardens
  • Hydrogeological Study - Construction MOTOR OIL HELLAS New tank installations
  • Concrete Composition Studies Ionia Odos
  • Santorini Airport
  • New Port of Patras
  • New Icon port connection Egnatia Street, Florina - Niki Section
  • Geotechnical engineering tests
  • Olympia Street
  • PASS Subsea pipeline of Aegina - EYDAP
  • Geotechnical engineering tests Nestorius Dam Kastoria
  • I. Church of St. Andreas Loutraki
  • Fixation & restoration Chios College Improvement of building infrastructure
  • Old Fort of Corfu - Defensive wall Fortification & Restoration of Vatik Castle
  • Maintenance & restoration I. Church of the Assumption of the Virgin
  • Rafina Settlement of Eschatia stream Control of earthworks, concrete
  • Amarinthos-Gymnos drainage network PV park
  • PPC SA - Megalopoli
  • Geotechnical investigation for the construction of Atsipopoulou High School, Rethymnon
© namalab.gr | Κατασκευή Iστοσελίδων Κατασκευή Iστοσελίδων HellasSITES HellasSITES